Link to Content Area
:::

Institute of Transportation, MOTC

:::
  • small size
  • medium size
  • large size
  • print
  • facebook
  • plurk
  • twitter

Overall planning of bicycle-friendly environment network and the implementation of maps for the model network system (1/3)

  • Date:2019-03-05
  • Update:2019-03-05
  • Department:IOT

Overview :

  Based on the instructions of the Executive Yuan, the “Overall Planning of island-wide Bicycle-friendly Environment Network & MOTC Bicycle Network Implementation Plan” was promulgated by MOTC on August 06, 2014 for promotion during 2015~2018. Under the support of Sports Administration, Ministry of Education, the construction of “No. 1 Circular Island Bikeway” was completed at the end of 2015. To establish a well based island-wide bicycle-friendly environment network, we cooperate with “MOTC Bicycle Supervision & Coordination Promotion Team” for carrying out the line checking and adjustment during 2016~2018 in order to confirm the model network. By doing so, the TRA stations and scenic spots are also planned for establishing the connection of lines (Including scenic spots and local-feature line) as well as improving and coordinating relevant service facilities in order to implement typical model network. In the meantime, we also implemented the bikeway network related information system to realize the “Circular Bike Dream”. We also reinforced the interactive performance and all kinds of marketing activities for the system in order to create a bicycle gateway that will be trusted and frequently visited by general public.

Research result:

  • Complete the planning and inspection of bicycle-friendly environment for the typical network in each area by 2016 and proposed improvement suggestions.   
  • Complete the journey characteristics and satisfaction investigation for the typical network in each area along the “No. 1 Circular Island Bikeway” (2015~2016) and proposed the utilization effect analysis and performance assessment.
  • Complete the collection, implementation and correction of maps for circular-island bicycle network during 2015~2016 (including site panoramic view).
  • Complete the network version, mobile version and handset application program version of model network for the bicycle network system.
  • Implemented the website for promoting the aforesaid “No. 1 Circular Island Bikeway” in order to enhance the exposure and clicking rate of such website.

Promotion of result:

  Continue the marketing of website for “No. 1 Circular Island Bikeway” in order to in order to enhance its exposure and clicking rate (The marketing activities will be executed for different activity themes separately in 2017~2018).

  The Bicycle System Planning & Design Referential Manual compiled for this Plan can be used as the reference of for the competent bikeway construction authority (to be published in October 2017).

 “No. 1 Circular Island Bikeway” main line touring map and 2015~2018 network map.

Micro-film press conference and website of “No. 1 Circular Island Bikeway”.

Count Views:642
Top