Title The Passengers’ Access Routes Improvement of Taipei Interchange Station
Dept Transportation Safety Division
Year 2010
Month
Price
Summary The planning for the exits and route improvements for passengers in Taipei Interchange Stations are based on the underground B1 area, the B3 passengers’ transfer area, related adjacent floors and areas for the major target space. The major results of the study are as follows.

Review and analyze the transfer area through the station of foreign and Taiwan.
Review and analyze the transfer area through Taipei Station.
Survey and Identify the number and locations of the exits, for both the current situation and for future expansion.
Carry out a survey of the existing routes used by interchange passengers in Taipei Station.
Review the interface between transfer area and main aisles.
Analyze the mitigation measures and report.
Post date 2010/11/19
Hashtags
View count: 107